Thanks for all the input.
1.   Joel, at First Call Communications cleared up the voltage question.
Unless special ordered, all US Tower motors are 110VAC., a 20 amp service
is recommended.  Several suggestions received from the reflector suggested
running a 220VAC, 20 amp service to the tower, and splitting it into two
110 circuits, one for the motor and one for utility use.
2.   Configuration of underground feeds to the tower:
You all said the same thing,  check the local code.  I spaced that one out,
 the local code will dictate this one.
3.  What kind of pipe, solid or perf:
Ditto,  check the code.
Thanks for all the help.
Gene Spinelli
--