On 6/20/01 10:40 AM, Ward Silver at hwardsil@WOLFENET.com wrote:
>
>The only problem I've had was that water got into the pipes (my fault) and
>had to be siphoned out. Put a cap on the pipes or fill them with cement
>(after you put the bolts in).
Wouldn't it be better practice to place the pipes so they go through the
concrete base and into 4-6" of gravel for drainage?
This is the typical practice for Rohn 25/45-type bases using either a
base section or embedding a full-length section.
Bill Coleman, AA4LR, PP-ASEL Mail: aa4lr@arrl.net
Quote: "Not within a thousand years will man ever fly!"
-- Wilbur Wright, 1901
List Sponsor: Are you thinking about installing a tower this summer? Call us
for information on our fabulous Trylon Titan self-supporting towers - up to
96-feet for less than $2000! at 888-833-3104 <A
HREF="http://www.ChampionRadio.com">
www.ChampionRadio.com</A>
-----
FAQ on WWW: http://www.contesting.com/FAQ/towertalk
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
|