I am very interested in the well pipe element of the
current tower ground thread.  
We are awaiting a County permit and will be building
a new home this summer (steel walls and roof).  
We are using all cpvc for water in the house because
here in lightning-prone West Central Florida pinhole
leaks in solder joints are a common problem from
indirect lightning strike surges into homes.  
The well-head is 30-40 feet from the common service and
the common service/tower entry-point into the house.  
We planned cpvc for the water line into the other side
of the house but there is, of course, an electrical cable
for the well pump -- I suppose coming from the common
entry-point to the well-head.  
Do I need to run a heavy ground wire from the well-head
in addition to the power cable for the submersible
pump?  
Should I ground the wire from the well-head to the
common entry-point with 8 foot ground rods at more
than one point in between?  
Any chance doing any of this may increase the pick-up
of ground surges?  
--
Thanks! & 73, doc kd4e
West Central Florida
Drake, Heathkit, Kenwood, TenTec, Yaesu
Radio Life: http://www.gospelcom.net/twr/
Linux-Incompatible hardware is defective!
USA Pres. Election 2004: http://www.rnc.org/
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
_______________________________________________  
See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless Weather Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions and ask for Sherman, W2FLA. 
 
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk  
 |