[TowerTalk] Foundation progress report -- and thoughts on"professionals"

To: towertalk reflector <towertalk@contesting.com>
Subject: [TowerTalk] Foundation progress report -- and thoughts on"professionals"
From: Alan NV8A <nv8a@att.net>
Date: Wed, 25 Oct 2006 00:10:55 -0400
List-post: <mailto:towertalk@contesting.com>
The contractor came on Saturday and started digging the 5' x 5' x 7' 
hole for the foundation for my US Tower HDX-555. He used an oversized 
post-hole-digging attachment on a Bobcat, then squared it out by hand, 
but ended up with a hole that is more like 9' x 8' at the top.

By the time he came back Monday, the hole was half-full of water after 
heavy rain and he didn't have a pump with him, but he went ahead and 
built a frame for a 7' x 7' top, but with the top surface 10" above 
grade (because he had brought 10" wide boards) instead of the maximum 8" 
specified on the drawing; I had him dig out under the ends of his 
framing so that the top would be less than 8" above grade. He was then 
about to construct a plywood template for the mounting bolts instead of 
using the base plate itself as described in the docs. I had given him.

He was to come back Tuesday to do the rebar cage (but canceled), but I 
had already asked him how he was going to support the cage at the 
specified 3" above the bottom of the hole. He replied that he was 
planning to drive the rebar down into the dirt at the bottom of the 
hole!!! When I pointed out that this was contrary to the engineering 
drawing and was, moreover, according to everything I have read, an 
absolute no-no (as discussed here recently), he said he would put bricks 
under the bottom of the vertical bars to support them.

This guy is supposed to be a "professional" (he normally builds 
supermarkets and the like, but the construction business and the economy 
in general are a little slow around here these days -- too many 
businesses dependent on the US auto industry), yet it seems that he does 
things "by guess and by golly." I'm glad I was around to keep an eye on 
things. Based on this and other experiences, I often wonder whether 
"professional" sometimes just means a person who does a particular kind 
of work for a living but as cheaply and as quickly as possible?

We may have below-freezing temperatures Wednesday, but he's planning to 
set the base plate and bolts in place then and pour concrete Thursday or 
Friday. In the meantime I'll be putting in place the conduits and 
electrical box for the lightning protection devices.

BTW, he hit clay about 1ft. from the bottom of the hole. Does that 
indicate that the the foundation should be constructed differently? 
AIUI, although clay is difficult to dig it doesn't provide much support.

Alan NV8A
Zeeland, MI
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>