Re: [TowerTalk] Question about lowering a Fold-Over tower

Subject: Re: [TowerTalk] Question about lowering a Fold-Over tower
From: "Gary \"Joe\" Mayfield" <>
Date: Fri, 3 Feb 2012 00:42:51 -0600
List-post: <">>
I did it without the falling derrick, as I did not have room for one.  My
solution was power tools.  You can see the pictures at

It is the first link.

Joe kk0sd

-----Original Message-----
[] On Behalf Of Richard (Rick)
Sent: Thursday, February 02, 2012 12:27 PM
To: Wilson Lamb
Subject: Re: [TowerTalk] Question about lowering a Fold-Over tower

On 2/2/2012 7:48 AM, Wilson Lamb wrote:

> Worse yet, if you get the least lateral displacement you will get the
> off to the side of the hinge/tower plane and you will then have the top of
> the tower trying to go sideways because of the cable pull being off axis!
> You can tear your hinge apart and wreck your beam in a heartbeat>

In my early days of experimenting with irrigation pipe verticals I 
encountered this problem, but it just wrecked some old tubing.
Glad I didn't learn this on a tower.  You really want to side guy
the tower if possible.

> The falling derick advice is right on, BUT you have to be sure the base of
> the derick is wide enough to provide the lateral stability you need to
> prevent the off center situation above.  AND you have to secure the cable

I prefer to side guy the falling derrick.  Again, I experienced early
on the consequences of not doing this.

I always mount a pulley at the top of the derrick and run the rope 
through it to a ground anchor located where the pulley hits the ground. 
  This gives me positive pull down when the tower is near vertical, and 
controlled descent.  If you just tie a rope to the
top of the derrick, you have no leverage when the tower is near

Rick N6RK