Towertalk
[Top] [All Lists]

[TowerTalk] Next Step.

To: "towertalk@contesting.com" <towertalk@contesting.com>
Subject: [TowerTalk] Next Step.
From: "Roger (K8RI) on TT" <K8RI-on-TowerTalk@tm.net>
Date: Mon, 16 Sep 2013 03:25:15 -0400
List-post: <towertalk@contesting.com">mailto:towertalk@contesting.com>

After a number of interruptions I finally managed to get the third tower mounting plate welded to the 5' of #10 rerod and painted with cold galvanizing. Hopefully I can get iy mounted on the bottom of the raising fixture. The other two are already mounted due to the good graces of N8ERF. Once the third one is mounted I can start wiring up the rerod cageand build the 2 X 6 frame to hold this assembly level in the hole so we can pour the concrete.

Progress is slow, but at least it's progress.

73

Roger (K8RI)

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>
  • [TowerTalk] Next Step., Roger (K8RI) on TT <=