Like these?
http://www.dxengineering.com/parts/dxe-ecls-200
They have other sizes available.
On 11/26/2014 10:30 PM, Wayne Kline wrote:
 
Another neat trick with a torrid wound  balun.
   
I  weld a #10-32   1/2  machine screw to a 2" all stainless hose clamp  jus 1" past the end of the tightening slots.
  
I then drill a hole in the  4" dead center in the bottom of the NEMA Box/  insert the threaded 10/32 machine screw  in the hole DEAD center of the wound torid
  
Instant mounting   all my boom are  2"  but can install what ever size clam you need .
  
  
  Wayne
  
Ps
   4 yrs ago I had a wind milling antenna... the coax STRECHED  RG-213  ... 
ripping the  brad and stretching  the insulation rg8X size  never tor the 
center conductor.
   
the W2FMI build torrid stayed   attached to the boom by the  #10 machine screw ..
  
  
  
  		 	   		
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
--
73,
Gary K9GS
Greater Milwaukee DX Association: http://www.gmdxa.org
Society of Midwest Contesters: http://www.w9smc.com
CW Ops #1032   http://www.cwops.org
************************************************
 
 
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 
 |