Towertalk
[Top] [All Lists]

Re: [TowerTalk] Conduit installed in foundation slab

To: "towertalk@contesting.com" <towertalk@contesting.com>
Subject: Re: [TowerTalk] Conduit installed in foundation slab
From: Blair <ve3zbm@rogers.com>
Date: Tue, 9 Dec 2014 10:25:38 +0000
List-post: <towertalk@contesting.com">mailto:towertalk@contesting.com>
Thank to everyone who replied to my query. You have asuaged my fears and will 
proceed with embedding my feedline conduit in the tower foundation. I will 
likely cap the schedule 80 conduit with a termination similar to that which is 
used for overhead electrical utility lines feeding a meter base. I can’t recall 
the actual name for this cap at the moment, but you get the idea.


Regards, Blair.






VE3ZBM





On 12/08/14, Blair (VE3ZBM) wrote:

Good afternoon, All. 

I have not found a satisfactory answer to whether or not a 2 or 3" schedule 40 
PVC conduit, installed ~3' below grade and into a 5' x 5' x 4' deep 
steel-reinforced free standing tower foundation will derate or harm the slab's 
overall integrity. I am preparing for my new tower (to be installed next 
spring) and would like to bring the cable feeds up inside the tower base 
thereby eliminating tripping hazards and other aesthetic concerns. 

Thanks in advance,

Blair VE3ZBM

Sent from my iPhone
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
<Prev in Thread] Current Thread [Next in Thread>