Hi All -

First time poster to the list, long-time lurker.

I'm getting set to install my first tower after having been in the hobby
for nearly 20 years.  I'm going to install 40' of Rohn25 with a Hazer.  I'm
going to set it in a 4x4x5 block of concrete that I have the option to make
it taller later on (without the Hazer, of course.)

Please advise if I am correct:  I do not need to guy the tower given the
base size and height, correct?  I've been told I can go up to 50' unguyed
by some, but others say anything over 40' needs guyed.

Regarding grounding: I've seen different ways of doing it.  What is the
best way to ground the tower?  Rod at the bottom of the hole?  Rod to the
side of the slab?

I'm going to feed it underground with a 3" CPVC line coming up into a
weatherproof box mounted a short distance from the tower.  Do I need to tie
the ground bus in the cabinet to the ground in the tower, or do I need to
keep them separate?

Thanks

Rob
w0jrm
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>