To: | Tom Rauch <w8ji@contesting.com>, Topband <Topband@contesting.com> |
---|---|
Subject: | Re: Topband: Stub measurement error |
From: | Ken Brown <ken.d.brown@hawaiiantel.net> |
Reply-to: | ken.d.brown@hawaiiantel.net |
Date: | Wed, 05 Sep 2007 09:10:32 -1000 |
List-post: | <mailto:topband@contesting.com> |
If you are adding a stub to your transmission line system, aren't you going to need a tee to connect it anyway? Would you not want to cut the stub to the right length with the tee included? Why would you call this an "error" when the tee is part of the system both when measuring it and when operating with it? DE N6KB _______________________________________________ Topband mailing list Topband@contesting.com http://lists.contesting.com/mailman/listinfo/topband |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Topband: Stub measurement error, George Cutsogeorge |
---|---|
Next by Date: | Topband: Stub measurement error, George Cutsogeorge |
Previous by Thread: | Topband: Stub measurement error, Tom Rauch |
Next by Thread: | Re: Topband: Stub measurement error, Tom Rauch |
Indexes: | [Date] [Thread] [Top] [All Lists] |