----- Original Message -----
From: "Rod Elliott" <elliottr@hurontel.on.ca>
>
> The Glen Martin Engineering M-1850A package looks attractive. It contains
> five 10-foot sections of 18-inch face anodized aluminum tower, plus hazer
> assembly, kevlar guys, guy anchors, and tilt base assembly. Beam would
> probably be a F12 C3S.
>
> Is this a good choice?
three questions:
1. the cord to release the safety latch is very small diameter--
any problems?
2. The company spokesman quoted $400 for an 80mph wind
load analysis! What have others found to be the case?
3. Has anyone stacked beams, one to go up to the top and
another to somehow be lower for a different elevation angle.
k7puc
|