[TowerTalk] Lifting a TX472 off a semi & cost of pumpingconcrete in my

To: <towertalk@contesting.com>
Subject: [TowerTalk] Lifting a TX472 off a semi & cost of pumpingconcrete in my area
From: k0myw@att.net (k0myw@att.net)
Date: Tue Apr 29 13:05:22 2003
Dan,

I employed a wrecker to lift my U.S. Towers HDX-555 out of a semi trailer when 
it arrived.

Make sure the towing company understands that you require a wrecker with an 
extendable hydraulic boom. Ideally you'll want to extend the boom into the 
trailer to near the midpoint of the tower for smooth exit and one-step 
delivery to the base site.

The wrecker should have necessary straps or chains with which to grab the 
tower. If not, a simple vehicle towing strap will work fine, if you have one 
in the trunk of your car.

Have at least one other person available to help you "steer" the tower as it 
dangles from the wrecker's boom during the trip to the base site.

The wrecker outfit charged me $25 for performing this chore, and I slipped the 
driver an extra 10 bucks. If your driver is like mine, he'll get interested in 
this unusual assignment and will be willing to take extra steps to ensure safe 
completion of the delivery.

MOST IMPORTANT TIP: Don't do any of the above before crawling into the trailer 
and personally giving the tower a thorough look-see. The first time a tower 
was delivered to me, I discovered it had been damaged in transit by a 
dunderheaded forklift operator. I refused delivery -- which is easier to do 
while the tower remains on the trailer, in control of the trucking company. 
(By the way, U.S. Tower was very good to work with in this situation. They 
didn't balk at taking back the tower, and sent out another in timely fashion.)

If for some reason it's impossible for the wrecker to deposit the tower 
directly at the base site -- and if you don't have several willing strong 
backs to help you lug the thing the final few feet -- I found that an 
automotive engine hoist handled my tower easily. Of course, I had the luxury 
of firm asphalt pavement right up to the tower base; you probably would have 
to lay down sturdy plywood or some other temporary "pavement" to protect the 
lawn and prevent the hoist's small wheels from sinking into the turf.

Gud luk!

Mike KØMYW




> Hello All
> 
> i will be receiving my TX472 shortly from US Towers ,
> their recomendation is to use a wrecker (which is much
> more cost effective than the alternatives) does anyone
> have any experience/hints ??
> 
> following a thread concerning hauling/pumping concrete
> from a week or two ago i checked into it in my area
> and discovered that it isnt really feasible here.... i
> have to go 250' plus... the pumping guys charge
> $165/hr with 4 hour minumum.... $2.50 per/yd of
> concrete... since its over 140' run they have to bring
> in a second truck with a one time fee of $100, which
> is roughly $780 just for the pumper plus the $450 for
> concrete...so i guess i am going to have to get
> permission from the neighbors to let me rut up their
> yard since the septic system is between the road and
> the tower base....
> 
> Dan N8DCJ
> 
> __________________________________
> Do you Yahoo!?
> The New Yahoo! Search - Faster. Easier. Bingo.
> http://search.yahoo.com
> _______________________________________________
> 
> See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless 
> Weather 
> Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions 
> and ask for Sherman, W2FLA.
> 
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
<Prev in Thread] Current Thread [Next in Thread>