In a message dated 11/23/2008 4:17:52 A.M. Pacific Standard Time,  
towertalk-request@contesting.com writes:

>  I won't bore the?readers with the usual retread questions.?  Already did 
the reading etc. and lowered the old beam a month ago.? This is  one on how to 
rig the haul line to pull up the 110 lb SteppIr  yagi.

>  The tram line is to be rigged about 3 feet above the  top on the Rohn 45 
tower which has a flat top plate.? The boom will be mounted  right above the 
top plate.? The tram line is continuous in that it goes thru a  pulley and down 
to a 'back stay point'.? Trying to allow the tram line some  ability to move 
but direct?most?of the force down the mast to the  rotor.

>  If I can pull the beam up as far as it can get, to  the haul line pulley, 
I plan to relax the tram line and let it settle the boom  down where it will 
rest on the top plate until I can use other means to raise  it the 6 inches to 
the boom to mast plate.
 
    Sounds good to me. 



         For those interested  in more information, I have a chapter from my 
way-behind-schedule tower book  with illustrations that I can send you. 
 
Cheers,
Steve    K7LXC
TOWER TECH
**************Make your life easier with all your friends, email, and 
favorite sites in one place.  Try it now. 
(http://www.aol.com/?optin=new-dp&icid=aolcom40vanity&ncid=emlcntaolcom00000010)
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>
  • Re: [TowerTalk] Tramming help sought, K7LXC <=