- 1. [TowerTalk] Basic question (score: 1)
- Author: ad6id@arrl.net (Tony)
- Date: Mon, 03 Sep 2001 16:33:51 -0700
- Hi Don, When looking for towers, keep in mind that the building code is interested in the wind load at 70 mph while most tower ads specify wind load at 50 mph. You have to ask for the 70 mph figure.
- /archives//html/Towertalk/2001-09/msg00112.html (7,721 bytes)
This search system is powered by
Namazu