Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Fwd\:\s+Re\:\s+Guy\s+wire\s+assembly\s+question\s*$/: 3 ]

Total 3 documents matching your query.

1. [TowerTalk] Fwd: Re: Guy wire assembly question (score: 1)
Author: <donovanf@starpower.net>
Date: Fri, 13 Apr 2007 10:53:03 -0400 (EDT)
Phil, I've also used the bench vise method for years. Many tower installations do not use the Preformed Line Products's recommended thimble size for big grips. For 1/4 inch EHS, PLP specifies 1/2 inc
/archives//html/Towertalk/2007-04/msg00245.html (10,289 bytes)

2. Re: [TowerTalk] Fwd: Re: Guy wire assembly question (score: 1)
Author: "Phil Jung" <k9pj@b2xonline.com>
Date: Fri, 13 Apr 2007 14:38:11 -0400
Thanks Bob, George, Keith and Frank The vise/crescent wrench technique worked very well, and the big grips sure are great. Two of us without prior experience prepared six complete sets of leaders car
/archives//html/Towertalk/2007-04/msg00250.html (12,447 bytes)

3. Re: [TowerTalk] Fwd: Re: Guy wire assembly question (score: 1)
Author: "Dick Green" <wc1m@msn.com>
Date: Sat, 14 Apr 2007 00:11:55 -0400
I'm not so sure nominal thimble size tells the whole story. While Preformed specifies a 1/2" thimble for 1/4" EHS cable, note that the minimum groove diameter for a Preformed grip used with 1/4" EHS
/archives//html/Towertalk/2007-04/msg00261.html (14,013 bytes)


This search system is powered by Namazu