Hi, I have two Tri-EX THD series towers and have had trouble with them jamming when partially erected. I am thinking of putting a cable from the top section to a pulley on the bottom section so that
I've also wondered about the positive pull down. I have an old Hygain manual for their electric winch (I don't have the electric winch though) and it shows how to run the positive pull down cable. If
Gravity is what comes into play when your tower doesn't have positive pull down, which is very dangerous, especially when attempting to let the tower down at night when you can't watch the tension in
I have an LM-470 with positive pull-down. There are four sections. A cable runs from the bottom of the inside center fourth section down to a pulley at the bottom center of the base, to another pulle
an old Hygain manual for their electric winch (I don't have the electric winch though) and it shows how to run the positive pull down cable. the 3rd section down to a pully at the bottom of the secon