Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Shack\s+to\s+service\s+entrance\s+ground\s*$/: 23 ]

Total 23 documents matching your query.

1. [TowerTalk] Shack to service entrance ground (score: 1)
Author: "K8ZM" <k8zm@oh.rr.com>
Date: Fri, 18 Aug 2023 11:32:45 -0400
I am getting close to my project of completely re-doing all coax and control cables entering the shack and "finally" have almost everything. I'll be installing an 8 Ft (5/8" Dia) ground rod at the sh
/archives//html/Towertalk/2023-08/msg00023.html (7,271 bytes)

2. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: john simmons <jasimmons@pinewooddata.com>
Date: Fri, 18 Aug 2023 21:54:09 +0000
See the Motorola R56 book. Make sure your heart meds are up to date. -de John NI0K I am getting close to my project of completely re-doing all coax and control cables entering the shack and "finally"
/archives//html/Towertalk/2023-08/msg00024.html (8,276 bytes)

3. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim Brown <jim@audiosystemsgroup.com>
Date: Fri, 18 Aug 2023 15:05:39 -0700
National Electric Code is the better reference for conductor sizing. For Grounding and Bonding practices, N0AX's ARRL book, to which I contributed, is a winner. My take on it is here. Ignore "audio"
/archives//html/Towertalk/2023-08/msg00025.html (7,799 bytes)

4. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: "Lux, Jim" <jim@luxfamily.com>
Date: Fri, 18 Aug 2023 16:00:44 -0700
On 8/18/23 8:32 AM, K8ZM wrote: I am getting close to my project of completely re-doing all coax and control cables entering the shack and "finally" have almost everything. I'll be installing an 8 Ft
/archives//html/Towertalk/2023-08/msg00026.html (10,322 bytes)

5. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim Brown <jim@audiosystemsgroup.com>
Date: Fri, 18 Aug 2023 16:21:31 -0700
Nor is it part of a lightning grounding/dissipation system, so all those rules don't matter. There absolutely IS a requirement that all grounds in a premises be bonded together. If power is fed from
/archives//html/Towertalk/2023-08/msg00027.html (9,903 bytes)

6. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: john nistico <electric911inc@hotmail.com>
Date: Fri, 18 Aug 2023 23:41:30 +0000
In my VA qth I have an extensive grounding halo with 20 ground rods cad welded to the conductor. Get Outlook for iOS<https://aka.ms/o0ukef> ________________________________ From: TowerTalk <towertalk
/archives//html/Towertalk/2023-08/msg00028.html (10,542 bytes)

7. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: "Lux, Jim" <jim@luxfamily.com>
Date: Fri, 18 Aug 2023 16:42:46 -0700
On 8/18/23 4:21 PM, Jim Brown wrote: On 8/18/2023 4:00 PM, Lux, Jim wrote: OK - you're in sort of an interesting situation, because your "shack ground" electrode isn't part of the required grounding
/archives//html/Towertalk/2023-08/msg00029.html (10,617 bytes)

8. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: "Joe Subich, W4TV" <lists@subich.com>
Date: Fri, 18 Aug 2023 20:34:57 -0400
- You could conceivably hook the rod to the "greenwire" ground and call it done. Only if you wish to destroy the majority of your equipment and risk a shack fire with every thunderstorm. Connecting t
/archives//html/Towertalk/2023-08/msg00030.html (12,031 bytes)

9. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim Miller <jim@jtmiller.com>
Date: Fri, 18 Aug 2023 20:51:57 -0400
At the risk of stating the obvious run all antenna circuits to enter near the service entrance and bond there. Continue the run inside the house to the shack. Jim ab3cv ______________________________
/archives//html/Towertalk/2023-08/msg00031.html (12,182 bytes)

10. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim Brown <jim@audiosystemsgroup.com>
Date: Fri, 18 Aug 2023 19:51:10 -0700
At the risk of stating the obvious run all antenna circuits to enter near the service entrance and bond there. Continue the run inside the house to the shack. For many reasons that depend on where ev
/archives//html/Towertalk/2023-08/msg00032.html (11,032 bytes)

11. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: <john@kk9a.com>
Date: Fri, 18 Aug 2023 23:05:03 -0400
I am wondering why nearly everything is made this way. Is connecting to the chassis too costly? John KK9A Jim Brown jim at audiosystemsgroup.com Virtually all consumer products, everything from compu
/archives//html/Towertalk/2023-08/msg00033.html (8,591 bytes)

12. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim Brown <jim@audiosystemsgroup.com>
Date: Fri, 18 Aug 2023 20:49:36 -0700
Yes. For 30-40 years, standard practice has been to build boards with connectors mounted to the board and shove them into an enclosure with holes for connector to fit through. It costs more build so
/archives//html/Towertalk/2023-08/msg00034.html (11,612 bytes)

13. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: "K8ZM" <k8zm@oh.rr.com>
Date: Sat, 19 Aug 2023 08:30:29 -0400
Here is a poor no-scale sketch......hopefully it will come through proportionally.... 1) Shack is at opposite side of house from service entrance, tower is at rear corner of back yard 2) All coax/con
/archives//html/Towertalk/2023-08/msg00035.html (12,192 bytes)

14. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Mike H <mph@sportscliche.com>
Date: Sat, 19 Aug 2023 10:35:30 -0400
According the the ARRL Grounding and Bonding book, Good Practices and Guidelines: "Should I bond my tower to the station ground? ...Once the distance (between tower and station) exceeds 40 to 50 feet
/archives//html/Towertalk/2023-08/msg00037.html (9,370 bytes)

15. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: "jim.thom jim.thom@telus.net" <jim.thom@telus.net>
Date: Sat, 19 Aug 2023 09:12:04 -0700
<According the the ARRL Grounding and Bonding book, Good Practices and <Guidelines: <"Should I bond my tower to the station ground? <...Once the distance (between tower and station) exceeds 40 to 50
/archives//html/Towertalk/2023-08/msg00038.html (9,460 bytes)

16. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: "Lux, Jim" <jim@luxfamily.com>
Date: Sat, 19 Aug 2023 09:28:28 -0700
<According the the ARRL Grounding and Bonding book, Good Practices and <Guidelines: <"Should I bond my tower to the station ground? <...Once the distance (between tower and station) exceeds 40 to 50
/archives//html/Towertalk/2023-08/msg00039.html (11,414 bytes)

17. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim Brown <jim@audiosystemsgroup.com>
Date: Sat, 19 Aug 2023 10:29:10 -0700
"Should I bond my tower to the station ground? ...Once the distance (between tower and station) exceeds 40 to 50 feet, however, the inductance of the ground conductor will be too high for the bond to
/archives//html/Towertalk/2023-08/msg00040.html (10,377 bytes)

18. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: "Lux, Jim" <jim@luxfamily.com>
Date: Sat, 19 Aug 2023 10:36:18 -0700
"Should I bond my tower to the station ground? ...Once the distance (between tower and station) exceeds 40 to 50 feet, however, the inductance of the ground conductor will be too high for the bond to
/archives//html/Towertalk/2023-08/msg00041.html (10,496 bytes)

19. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim Brown <jim@audiosystemsgroup.com>
Date: Sat, 19 Aug 2023 10:52:40 -0700
Right Jim _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/
/archives//html/Towertalk/2023-08/msg00042.html (9,677 bytes)

20. Re: [TowerTalk] Shack to service entrance ground (score: 1)
Author: Jim W7RY <jimw7ry@gmail.com>
Date: Sat, 19 Aug 2023 20:12:22 -0500
(earthing) and bonding. You will find very few molds for #2 AWD *stranded is a different* OD than solid. Jim W7RY On 8/19/2023 11:28 AM, Lux, Jim wrote: On 8/19/23 9:12 AM, jim.thom jim.thom@telus.n
/archives//html/Towertalk/2023-08/msg00043.html (12,783 bytes)


This search system is powered by Namazu