- 1. Re: [TowerTalk] TowerTalk Digest, Vol 131, Issue 76 (score: 1)
- Author: The Dynan's <dynanminer@msn.com>
- Date: Sat, 30 Nov 2013 23:29:18 +0000
- The November 30 info in the message is incorrect: concrete is for building foundations , floor slab and streets, newly poured concrete is considered fully cured in 28 days.Maximum compressive stremgt
- /archives//html/Towertalk/2013-12/msg00005.html (32,165 bytes)
This search system is powered by
Namazu