- 1. [SECC] Work in progress at K4JRB (score: 1)
- Author: thompson at mindspring.com (David Thompson)
- Date: Thu, 31 Mar 2011 17:26:57 -0400
- I have gotten several things done to get me closer to operating. I got a tree man out and he removed the limbs in the way of turning the beams (mainly the 40). I fixed the PCB headphone jack in the s
- /archives//html/SECC/2011-03/msg00217.html (8,030 bytes)
This search system is powered by
Namazu