- 1. Re: [TowerTalk] [Tower Talk] Crank-up base (score: 1)
- Author: "Paul Christensen" <w9ac@arrl.net>
- Date: Fri, 2 May 2014 08:54:49 -0400
- Like NF4L, I'll be installing a pair of self-supporting Pirod towers north of Jacksonville. Tower #1 is 140 ft and will support a full-size 4 el M2 40m Yagi. Tower #2 is 100 ft and will support a Ten
- /archives//html/Towertalk/2014-05/msg00021.html (14,099 bytes)
- 2. Re: [TowerTalk] [Tower Talk] Crank-up base (score: 1)
- Author: Brian Amos <bamos1@gmail.com>
- Date: Fri, 2 May 2014 16:01:20 -0600
- Mike, if you look in the phone book for a geotechnical engineer you will probably find what you are looking for. A geotechnical engineer will tell you how to prepare the soil. A structural engineer w
- /archives//html/Towertalk/2014-05/msg00023.html (11,711 bytes)
This search system is powered by
Namazu