Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+\[Tower\s+Talk\]\s+Crank\-up\s+base\s*$/: 2 ]

Total 2 documents matching your query.

1. Re: [TowerTalk] [Tower Talk] Crank-up base (score: 1)
Author: "Paul Christensen" <w9ac@arrl.net>
Date: Fri, 2 May 2014 08:54:49 -0400
Like NF4L, I'll be installing a pair of self-supporting Pirod towers north of Jacksonville. Tower #1 is 140 ft and will support a full-size 4 el M2 40m Yagi. Tower #2 is 100 ft and will support a Ten
/archives//html/Towertalk/2014-05/msg00021.html (14,099 bytes)

2. Re: [TowerTalk] [Tower Talk] Crank-up base (score: 1)
Author: Brian Amos <bamos1@gmail.com>
Date: Fri, 2 May 2014 16:01:20 -0600
Mike, if you look in the phone book for a geotechnical engineer you will probably find what you are looking for. A geotechnical engineer will tell you how to prepare the soil. A structural engineer w
/archives//html/Towertalk/2014-05/msg00023.html (11,711 bytes)


This search system is powered by Namazu