Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Be\s+Careful\s+With\s+the\s+Tolerance\s+in\s+Laser\s+Levels\s+\(Tower\s+base\s+leveling\s*$/: 2 ]

Total 2 documents matching your query.

1. Re: [TowerTalk] Be Careful With the Tolerance in Laser Levels (Tower base leveling (score: 1)
Author: <john@kk9a.com>
Date: Sun, 23 Jul 2017 10:06:21 -0400
How do you use a water level to plumb a tower? I have been using a transit level for decades and it works in any WX. John KK9A To: towertalk@contesting.com Subject: Re: [TowerTalk] Be Careful With th
/archives//html/Towertalk/2017-07/msg00257.html (7,749 bytes)

2. Re: [TowerTalk] Be Careful With the Tolerance in Laser Levels (Tower base leveling (score: 1)
Author: Patrick <patrick_g@windstream.net>
Date: Sun, 23 Jul 2017 09:57:39 -0500
A good transit would be an excellent choice for checking tower plum after the tower was up. A water level could be used to check level of the steel in the concrete prior to tower erection (and prior
/archives//html/Towertalk/2017-07/msg00258.html (10,767 bytes)


This search system is powered by Namazu