Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Spring\s+Tower\s+Inspection\s+\&\s+Maintenance\!\s+\-Rep\s*$/: 3 ]

Total 3 documents matching your query.

1. [TowerTalk] Spring Tower Inspection & Maintenance! -Rep (score: 1)
Author: n4si@pobox.com (n4si@pobox.com)
Date: Tue, 1 Apr 1997 02:41:22 +0000
Frank, I'm too lazy too look it up right now, but I know there is a spec for 3 x diameter for spacing between Crosby clips; isn't there something in that area about the first space, or the total len
/archives//html/Towertalk/1997-03/msg00001.html (7,605 bytes)

2. [TowerTalk] Spring Tower Inspection & Maintenance! -Rep (score: 1)
Author: n4si@pobox.com (n4si@pobox.com)
Date: Tue, 1 Apr 1997 02:45:21 +0000
Frank, I know there is a spec for 6 x diameter for spacing between Crosby clips; can't remember anything in that area about the first space. I always assumed that the first clip needed to be close e
/archives//html/Towertalk/1997-03/msg00002.html (7,692 bytes)

3. [TowerTalk] Spring Tower Inspection & Maintenance! -Rep (score: 1)
Author: k0rc@pclink.com (Robert Chudek)
Date: Tue, 01 Apr 1997 02:58:49 +0000
Rohn drawing B-690712 states "Space cable clamps or fist grips 6 X cable diameter apart (U-bolt shall bear on dead end)". This particular illustration appears to be drawn to approximate scale, where
/archives//html/Towertalk/1997-03/msg00003.html (8,738 bytes)


This search system is powered by Namazu