Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Subject\:\s+Re\:\s+Tower\s+Legs\s+in\s+Concrete\s*$/: 3 ]

Total 3 documents matching your query.

1. [TowerTalk] Subject: Re: Tower Legs in Concrete (score: 1)
Author: "Bill Feissner" <ai3q@pa.metrocast.net>
Date: Wed, 29 Jun 2011 20:59:30 -0400
I Installed 2 Rohn towers some years back and my instructions right from Rohn stated to coat the tower legs with black roofing tar below and above where the legs come out of the cement. I gathered th
/archives//html/Towertalk/2011-06/msg00279.html (6,961 bytes)

2. Re: [TowerTalk] Subject: Re: Tower Legs in Concrete (score: 1)
Author: Jim Brown <jim@audiosystemsgroup.com>
Date: Thu, 30 Jun 2011 09:32:00 -0700
Two years ago, I poured cement around 4 ft of Rohn 25 for a 120 ft tower. I had previously painted the entire tower with ordinary house paint to minimize visibility. As it happens, I poured cement fo
/archives//html/Towertalk/2011-06/msg00280.html (8,424 bytes)

3. Re: [TowerTalk] Subject: Re: Tower Legs in Concrete (score: 1)
Author: "Mark Robinson" <markrob@mindspring.com>
Date: Thu, 30 Jun 2011 12:38:18 -0400
I made sure that the concrete base pad was slightly domed where the legs come out of the concrete and I also have a good slope on the top of the pad, so that the water runs away from the legs very we
/archives//html/Towertalk/2011-06/msg00281.html (8,351 bytes)


This search system is powered by Namazu