Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+tower\s+base\s+grounding\s*$/: 2 ]

Total 2 documents matching your query.

1. [TowerTalk] tower base grounding (score: 1)
Author: "Jim Jarvis" <jimjarvis@verizon.net>
Date: Sun, 29 Jan 2006 17:47:47 +0000
Dick, (TT): You raise several questions: "The (inspector's) note said all rebar must be bonded to the ground grid, and inspection will be required prior to backfill. " I think an argument can be made
/archives//html/Towertalk/2006-01/msg00577.html (8,860 bytes)

2. Re: [TowerTalk] tower base grounding (score: 1)
Author: "Gary Schafer" <garyschafer@comcast.net>
Date: Sun, 29 Jan 2006 16:41:11 -0500
By not bonding the rebar you run the risk of an arc inside the foundation with a lightning strike. Part of the strike will go through the bolts that the tower is bolted to in the concrete. Even if yo
/archives//html/Towertalk/2006-01/msg00582.html (11,566 bytes)


This search system is powered by Namazu