- 1. Topband: Assembly of Softrocks for 160m (score: 1)
- Author: "Steve Ireland" <vk6vz@arach.net.au>(by way of Bill Tippett<btippett@alum.mit.edu>)
- Date: Sun, 16 Apr 2006 18:17:40 -0400
- G?day Bill I saw the recent email from Tod K0TO about using a third party to assemble a V6 SoftRock for 160m and thought those on the reflector might be interested in a few practical hints about asse
- /archives//html/Topband/2006-04/msg00041.html (8,006 bytes)
- 2. Re: Topband: Assembly of Softrocks for 160m (score: 1)
- Author: "Greg - ZL3IX" <zl3ix@inet.net.nz>
- Date: Mon, 17 Apr 2006 12:37:43 +1200
- holding the component in place with a toothpick or a finger (easier than you would think) and soldering one end/one pin. I can highly recommend a pair of diamond-tipped dental tweezers for this purpo
- /archives//html/Topband/2006-04/msg00042.html (6,669 bytes)
This search system is powered by
Namazu