Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*Topband\:\s+Keying\s+from\s+CT\s+logging\s+program\s*$/: 2 ]

Total 2 documents matching your query.

1. Topband: Keying from CT logging program (score: 1)
Author: "Gary Nichols" <kd9sv@comcast.net>
Date: Fri, 30 Jan 2004 20:48:00 -0500
"CT also provides a PTT (push to talk) control signal on the parallel ports, which is asserted one baud (dot period) before CW sending begins. This provides time for amplifier relays to close before
/archives//html/Topband/2004-01/msg00321.html (7,345 bytes)

2. RE: Topband: Keying from CT logging program (score: 1)
Author: "James Wolf" <jbwolf@comcast.net>
Date: Sat, 31 Jan 2004 10:39:02 -0500
Not being familiar with the drive requirements of the amp or the limitations of the transceiver, it seems you could parallel the two paths using a steering diode in series with each control line. Jim
/archives//html/Topband/2004-01/msg00324.html (9,063 bytes)


This search system is powered by Namazu