Tower base concrete should not be in series between the tower and ground. There should not be a voltage gradient across the concrete base. All ground paths should be strapped around the concrete base. 73 Rob K5UJ _________________ Searchable Archives: http://www.contesting.com/_topband - Topband Reflector |