Hi all,
I have a question on the size of the concrete base that I need to
have for a small tower. The tower will be a 40' Rohn 25G tower
bracketed to the house at 10' and mounted to a SBH25G 3'4" Hinged
Short Base. The Rohn catalogue only covers the self-supporting
towers (pages 25G-2 and 25G-4) and the hinged plate (page
25G-14), with no information on the SBH25G and a bracket. The
antenna is going to be a small tri-bander (Mosley TA-33-jr-warc).
What Rohn shows for the self-supporting tower won't work with the
short base, as they show a 4'4" column of concrete with the tower
section sitting 2" into a stone drain bed and extending 6" out of
the concrete. I've emailed Rohn asking for their recommendations
and so far no answer.
My question is, what size hole do I need for this set up?
Thanks in advance.
73 - Ted - W8TTS
List Sponsor: ChampionRadio.com - Trylon self-supporting towers,
safety equipment, rigging gear, LOOS tension guages & more!
http://www.championradio.com
-----
FAQ on WWW: http://www.contesting.com/FAQ/towertalk
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
|