Uh...perhaps you can provide the excavator a drawing of what you need. A 5
cubic foot hole can be one foot square and five feet deep...or one foot deep
and 5 feet long...or whatever shape you want.
Best to provide a drawing with the dimensions of the hole clearly on the
drawing so that he can follow it. If he can't follow that, I'd say get a
new shovel operator. 5 cubic feet sounds pretty damn small for a tower
base, what is the tower?
> Can anyone supply me with some photos of a tower base being-dug/dug? I
> need
> about 5 cubic feet and it's rather difficult to explain to a
> non-communications person what I am wanting done and doing.
> Thanks,
> Ed
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|