On 6/16/2019 15:00, Dick Green WC1M wrote:
 
You put the temporary guys on with the base section on the ground, then with at 
least one helper you lift the base section onto the pier pin. Then, with at 
least one person holding the base section in place, you tighten the temporary 
guys.
 
Just last week, I put up a pier pin base Rohn 25 just about that way. 
While waiting for my helper to arrive, I attached the temporary guys to 
the top of the first section. A second set of ropes were attached to the 
anchors, and loosely tied to the middle of the section. I then stood the 
section on end, lifted it onto the pier pin, and tied the lower ropes 
onto the tower. That kept it upright until I went around to the anchors 
and tightened the main temporary guys. When my helper arrived, we were 
ready to put up the gin pole and install the second section. 
I wouldn't try that alone with Rohn 55, of course.
73,
Scott K9MA
--
Scott  K9MA
k9ma@sdellington.us
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 |