Here the  HV wiring is all completed.   That's a lot of components in
total.... in a big box.  The pair of finger guards is to allow intake air
to flow past the  17 kva ccs plate xfmr, caps etc.... then into the intake
of the EBM PAPST  330 cfm @ 1.0"   squirrel cage blower,  that will hang
below the mating RF deck....with RF deck sitting on top of the newly
completed  B+ supply...via a membrane between the two cabinets.   IE: the
blower will hang into the B+ supply.

Here is the short 5.30 min video depicting the final  HV  wiring.

https://www.youtube.com/watch?v=LmfoBsAvTIc
_______________________________________________
Amps mailing list
Amps@contesting.com
http://lists.contesting.com/mailman/listinfo/amps

<Prev in Thread] Current Thread [Next in Thread>
  • [Amps] 10 KW CCS ON 6M...USING THE 3CX-6000A7... PART 26, jim.thom jim.thom@telus.net <=