>
>> I dont recall seeing this is addressed on the reflector.
>>
>> In reviewing the Cabrillo format in the Nov QST, I didnt see any
fields
>> reserved for on/off times. How is everyone planning on dealing
with that
>> issue in the SS?
>
>I think the plan was for the log checking software to determine the
>operating time based upon the log itself. However, since listening
>time counts as operating time, I don't see how this can be done.
>
Seems straightforward to me, Tree. The rules say "periods may not be
less than 30 minutes in length."
Any 30 minute or more time gap is an off-time. Anything less is
on-time and the clock is running.
>I have raised this issue with the spec owner. I think at a minimum,
>there should be a field in the summary sheet for the operator to
>enter how much time they think they operated.
>
Will TRLog have a feature to include the on/off times in the summary
sheet automatically? With the \on and \off commands, that would be an
easy thing to do. But, then, I'm not the programmer....
73,
dale, kg5u
--
FAQ on WWW: http://www.contesting.com/trlogfaq.html
Submissions: trlog@contesting.com
Administrative requests: trlog-REQUEST@contesting.com
Problems: owner-trlog@contesting.com
Feature Wishlist: http://web.jzap.com/n6tr/trwish.html
|