| In a message dated 98-04-03 15:48:13 EST, you write:
<< I'm not arguing the merits (or lack thereof) of the manufacturers'
 recommendations, I'm just curious -- are these the exceptions that prove the
 rule? >>
Hi, Dick --
      In the case of the crank-up cable, I went by the CABLE manufacturer and
not US Tower. I would believe them over what US Tower says. Now it seems that
Bruce does recommend lubing the cable and pulleys which is still a good idea.
     I don't know that Rohn recommends a pier pin installation carte blanche.
Why would they make a short-base if it wasn't intended to be buried in
concrete? For ham installations and loads using a buried base section is well
within the design parameters of the towers. For bigger towers and bigger loads
(and I'm talking BIGGER) then using a pier pin is recommended. And should be
due to the high torque forces. 
     Once in awhile I will actually 'approve' a non-manufacturer way of doing
something but there's always a good reason.
     Keeping an eye on me, eh?
Cheers,  Steve   K7LXC
--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search
 |