We have put up big SSV sections with a heavy 20' gin pole,
and it is hairy. So much so, that the last time we elected
to use a helicopter.
With the lower section already set and levelled (we used it
as a jig for the anchor bolts) the rest of the tower was
assembled horizontally and the lift acccomplished easily
within 5 minutes.
Aloha,
Jonathan KH6X
kalepa@maui.net
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search
|