Hi,
Does anyone have the vertical loading specs. for the Rohn 25G and 45G towers.
I need this for from 70 to 120 feet height. This doesn't appear to be on the
Rohn website. I'm calculating the amount of tension I can put on a steel cable
run between two towers to hold a phased array. The cable will be tighten with
a winch at ground level and, together with the weight of the tower sections
and guy-wire tension will equate to the towers' (2) vertical loading.
Thanks for the help,
Joe Nemecek, K0JN
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search.htm
|