Pump it out! If you don't, the bottom concrete won't set properly and the
entire base will be compromised. When I had the truck pour my base, the
driver wouldn't pour until the hole was dry. That was the only way he
could guarantee the holding power/hardness of the concrete.
GL
Bill Hassan K1SM
At 07:29 PM 7/14/98 -0400, you wrote:
>
>I know this was answered before, but I can't find it. In my tower hole, I
>have about 1 foot of water. Must I pump this out before putting the
>concrete in? Or just dump the concrete in and let the water run out.
>
>73, Bruce Makas, K1MY
> Cape Elizabeth, Maine
> 207/767-8150
> k1my@nlis.net
>
>--
>FAQ on WWW: http://www.contesting.com/towertalkfaq.html
>Submissions: towertalk@contesting.com
>Administrative requests: towertalk-REQUEST@contesting.com
>Problems: owner-towertalk@contesting.com
>Search: http://www.contesting.com/km9p/search.htm
>
>
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search.htm
|