The Notice of Proposed Construction or Alteration permit is rather =
straight forward and easily completed.
Although I did one some time ago (1984), the approval time did not take =
too long. In my case, I was 1/2 mile from the airport boundry in =
Portland, OR and off to the side of the end of the main runway in the =
Columbia River on a floating building. I might have been aided by the =
fact that even though I applied for a 60 foot tower - er structure - =
there were sailboats in the next marina with masts over 70 feet high. Go =
for it.
Gordie, W7WHB
La Center, WA
--- StripMime Report -- processed MIME parts ---
multipart/alternative
text/plain (text body -- kept)
text/html
---
|