| Have here 100 ft. of SSV Heavy series (9N at base).
Cost:  
tower:   scrounged from cell site rebuild.   NO COST
            2 years old!
New bolts for tower (all bolts)                   $300
transport:  borrowed local logging truck     $25 for diesel fuel
hole:   "digging party with local hams"      $100 in food etc
rebar/concrete:  16 cu yds                       $300 in place
  (I agreed to PM all their two way radios)
finishing:   I did it.                                    no cost
permit (for steel / concrete placement)       $35
no tower permit required.
crane - installation (OUCH!!!)                       $400
minimum time.
grounding kits, bonding etc                       no cost
scrounged from cellsite contractors.
(includes 2500 ft of #8 radials.)
200 ft run 4" pvc                                       no cost
scrounged, excess from local 
construction project
310 ft. 1-7/8 hardline & connectors             no cost
"scrapped" from cellsite upgrade
325 feet 8 #12 conductor traffic signal light     no cost
cable (for rotor) scrounged from DOT 
electrical department.
new washer & dryer:                                 $1000
 I get a tower, xyl gets 
a new dryer and washer
It CAN be done on the cheap, and still be a professional grade installation.
Of course, it takes time, and a LOT of running around, (which is worth $$) and  
you must be in the "right place at the right time". 
... and also "brass ones" to ask someone you dont know:  "You don't want that, 
do you?"
Good building, keep smiling, and as always,
73!
Mike
KM1R
_______________________________________________
See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless Weather 
Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions 
and ask for Sherman, W2FLA.
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 |