Towertalk
[Top] [All Lists]

Re: [TowerTalk] Guy post

To: VAN FAIR <giw@bellsouth.net>
Subject: Re: [TowerTalk] Guy post
From: JohnnyO <johnnyo@apgwireless.com>
Reply-to: johnnyo@apgwireless.com
Date: Fri, 03 Mar 2006 16:35:16 -0600
List-post: <mailto:towertalk@contesting.com>
There is no need to add rebar - Just add the ready mix concrete you can
get at Lowes or Home Depot for $2.00ish per bag.

JohnnyO

On Fri, 2006-03-03 at 15:29 -0500, VAN FAIR wrote:

> I am currently using 3"OD steel pipe for my above ground guys for a Rohn 25 
> tower.  The post are 9 feet with 5 feet above hard ground set in concrete.  I 
> want to fill the post with concrete and one long rebar to strengthen them 
> against bending. Would concrete with gravel or just cement with sand be 
> better inside the pipes? I do not live in a high wind area. Thanks for your 
> help. Van 
> _______________________________________________
> 
> 
> 
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
> 
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>