Towertalk
[Top] [All Lists]

Re: [TowerTalk] Rohn 45/55/65 vs. AB-105 or Stainless 25?

To: towertalk@contesting.com, k5fnq@cox.net
Subject: Re: [TowerTalk] Rohn 45/55/65 vs. AB-105 or Stainless 25?
From: K7LXC@aol.com
Date: Fri, 29 Feb 2008 13:18:27 EST
List-post: <towertalk@contesting.com">mailto:towertalk@contesting.com>
 
In a message dated 2/29/2008 9:03:53 A.M. Pacific Standard Time,  
towertalk-request@contesting.com writes:

>  The top section is the hardest because the thrust bearing  and plate add a 
lot 
of weight to the top of that section. We did get it  after some struggle. It 
is hard to get the rope in the right area so it  does not flip.  Almost had 
to use a trail rope on the bottom section  to steady it.
 
    This is a hard won lesson. The LXC Sub-Prime  Directive is to "Break 
tasks into their smallest, bite-sized chunks and do not  try to do two things 
at 
once"; e.g. bringing up a beam with the coax attached,  pulling up a tower 
section with plates, thrust bearing, etc., bringing up a  section with the guys 
attached, etc. Everything is much easier when you do it  one thing at a time. 
 
Cheers,
Steve     K7LXC
TOWER TECH -
Professional tower services for hams
Cell: 206-890-4188



 



**************Ideas to please picky eaters. Watch video on AOL Living.      
(http://living.aol.com/video/how-to-please-your-picky-eater/rachel-campos-duffy/
2050827?NCID=aolcmp00300000002598)
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>