Towertalk
[Top] [All Lists]

Re: [TowerTalk] Cable working load/breaking strength...///

To: Bill Winkis <kc4pe@bellsouth.net>
Subject: Re: [TowerTalk] Cable working load/breaking strength...///
From: jimlux <jimlux@earthlink.net>
Date: Tue, 17 Nov 2009 05:52:26 -0800
List-post: <towertalk@contesting.com">mailto:towertalk@contesting.com>
Bill Winkis wrote:
> My blueprint of my LM70 clearly states that the pull/down cable shall be 
> ..3/16..7X19 and have a WORKING LOAD of 1400 pounds....most cable sold 
> advertise a
> BREAKING STRENGTH ...
> 
> And I am told the Working Load  is 1/10th of the Breaking Strength...
> 
> If this is true ..where in the world can you find a 3/16 cable with a 
> breaking strength of 14,000 pounds..???
> 
> Or am I missing something....


Maybe you're thinking of guy tensioning recommendations: 1/10th of rated 
capacity?

For a hoist application, the mfr may have different recommendations. 
Engineering such things is a bit different (what design factors do you 
use for where the cable runs over a sheave or pulley? what about dead 
weight vs live weight.)

Maybe LXC's directive is applicable here.. ask the mfr what they mean.


_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>