Dick,
You have to have power for the meter to work. As I mentioned in my last
email, you might get by with having both controllers hooked up in parallel
(with the exception of the two leads for the phasing capacitor - you only
want one in use). If that works, you do not have to worry about both being
on (master slave units - where the "slave" has the fuse removed in the meter
circuit.)
Dick K8ZTT
-----Original Message-----
From: towertalk-bounces@contesting.com
[mailto:towertalk-bounces@contesting.com] On Behalf Of Dick NY1E
Sent: Thursday, February 25, 2010 7:12 AM
To: towertalk@contesting.com
Subject: Re: [TowerTalk] Dual rotor controllers
>With two HAM-4/HAM-5/T2X controllers, remove the meter
>fuse from one unit (this is the "slave").
Does this mean you need the master powered up to use the slave?
Dick NY1E
www.ny1e.com
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
__________ Information from ESET NOD32 Antivirus, version of virus signature
database 4896 (20100225) __________
The message was checked by ESET NOD32 Antivirus.
http://www.eset.com
__________ Information from ESET NOD32 Antivirus, version of virus signature
database 4896 (20100225) __________
The message was checked by ESET NOD32 Antivirus.
http://www.eset.com
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|