> I recently put up a US Tower HDX-589 crank-up. UST recommends grouting
the
the space between the base plate and the top of the foundation block. I
have purchased the proper non-shrink construction grout and am getting
ready
to do the job. But I'm concerned because I used this stuff to patch my
house foundation before, and it sets up so quickly I'm not sure how much I
should mix up at a time.
I haven't seen any that set up THAT fast. There's plenty of time in my
experience.
You have to mix it pretty stiff so that it doesn't run; e.g. the
consistency of plastic. The fully cured strength looks like over 10 kpsi so
it's
plenty strong enough.