As with any installation.. there are no two alike. My Station consists of 12
runs of 7/8 in hard-line. As you can see the hardlines enter a Big Nema Box
and are the Brass connectors are held in lace by SS U bolts on a Aluminum
Channel. This channel has two # 8 aluminum ground to two 8' ground rods.
They then go to RG213 via N Connectors and into an inside panel, With 3" Barrel
connectors mounted mid way on a 4' Aluminum 1/4 angle. There were two more 8'
ground rods driven into the ground B-4 the basement concrete was poured. All
the two below the inside termination panel and the two below the out side
entrance box are bonded together via #8 conductor cable. This installation is
20years old and needs a paint Job. one of my spring Projects...... At the base
of Each tower 4 of them and the 80 meter 4 Sq I have the identical
configuration but just a smaller BOX Wayne W3EA Pictures link
http://s1263.photobucket.com/albums/ii640/WayneW3EA