Towertalk
[Top] [All Lists]

Re: [TowerTalk] Concrete curing time

To: Kent Olsen <[email protected]>, "[email protected]" <[email protected]>
Subject: Re: [TowerTalk] Concrete curing time
From: Al Kozakiewicz <[email protected]>
Date: Fri, 8 May 2015 15:45:03 +0000
List-post: <[email protected]">mailto:[email protected]>
Talk to your supplier.

The rule of thumb for "non fortified" concrete was to keep it wet for 7 days 
after setting at which stage you've reached the point of diminishing returns.

Modern concrete suppliers have a range of modifiers and additives at their 
disposal that can minimize or eliminate the need for watering. 

Al
AB2ZY

________________________________________
From: TowerTalk <[email protected]> on behalf of Kent Olsen 
<[email protected]>
Sent: Friday, May 8, 2015 11:28 AM
To: [email protected]
Subject: [TowerTalk] Concrete curing time

Hi All

I'm ready to pour the concrete for the foundation of my US Tower
HDX-572MDPL. The foundation plans call for a 28 day cure of the concrete. I
have seen others say that you need to spray water on the foundation 3 times
a day as well as keep it covered with burlap for the curing process. Does
the foundation need to be sprayed for the 28 days or can I stop at some
point in the process? The reason for asking is I am going on vacation about
halfway through the 28 days. I can get my neighbor to spray it for me but
would rather not.

73
Kent
K6DKO
_______________________________________________



_______________________________________________
TowerTalk mailing list
[email protected]
http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________



_______________________________________________
TowerTalk mailing list
[email protected]
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>