> One of the questions was grounding the feedline at the top of
> the tower and then at the side of the house at the polyphaser a few feet
> from the tower.
At a minimum, bond at the top of the tower, near the bottom of the tower at
a point above where the vertical cable run makes a bend to transition to a
horizontal run en route to the building, and again at the point of entry.
In most installations, the latter is directly bonded to, or actually is, the
station's common-point ground which the lightning arrestors are also be
bonded to.
--- Jeff WN3A
---
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|