I'm planning a tower installation for the summer. It is an HDBX,
sections 8-4 (40 feet) with the hinged base. A 70 pound yagi and a
Tailtwister will be at the top with a very short mast. I want to build a
falling derrick system for it.
I'm searching for answers to a couple questions:
* How long should the lever be?
* How much pulling force will I need to raise the tower? I realize
that the force will be maximum when the tower just comes off the ground.
I found this reference:
https://comtech.ru/en/production/towers/tower-accessories/ct-s3ts/ct-s3ts-falling-derrick-tilt-up-method/
I'm neither good at physics nor math above algebra.
Comments?
--
73,
-de John NI0K in rural Debs, MN USA