Re: [TowerTalk] Phasing Line Excess Routing

To: <towertalk@contesting.com>
Subject: Re: [TowerTalk] Phasing Line Excess Routing
From: <john@kk9a.com>
Date: Mon, 27 Feb 2023 11:22:59 -0500
List-post: <mailto:towertalk@contesting.com>
My Heliax is coiled near the antennas and grounded at the ends with
Andrew/Commscope ground kits. After multiple lightning strikes I have not
noticed any coil damage.

John KK9A




Steve Walter WA3A wrote:
Using a StackMatch and equal coax lengths is there any advice for the
excess coax in a two-stack.  80' and 50'.  I would prefer to coil the
excess 30' AFTER the shield ground at the base. This would mean one 80' run
would be continuous to the base ground block and the other would be
grounded at the 50' length and the excess coiled.  Does this significantly
affect phasing?  Or should I just coil it and then go to the ground block
so they would be identical?

Is coiling further up the tower acceptable?    Im also wondering how the
coil location affects lightning protection of the coax.

-- 
Steve Walter   WA3A

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>