Towertalk
[Top] [All Lists]

[TowerTalk] P E Fees

To: <[email protected]>
Subject: [TowerTalk] P E Fees
From: [email protected] (K4SB)
Date: Fri, 06 Feb 1998 11:57:34 -0800

Glenn wrote:

> snip Then I submit the drawings to the county who
> tells me that the reason for the high cost of permits is so they can
> review the plans to make sure that they comply with all applicable codes
> and then inspect the job to make sure that all is the same as the plans
> call for.

Sure, like the house inspector for the home I built who didn't know what a
ground fault
interrupter was. Or this house which I just bought which doesn't have a
master circuit
breaker in the CB box.

73

Ed


--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              [email protected]
Administrative requests:  [email protected]
Problems:                 [email protected]
Search:                   http://www.contesting.com/km9p/search

<Prev in Thread] Current Thread [Next in Thread>