N4KG is right on the downward thrust on the tower base. I remember the W0/5
in Louisiana telling me that sinking tower bases is very common in BC and SW
and his tower base sank 2 inches per year. He was involved with a 1000
foot tower and they put down a pier of
concrete and gravel below the actual base. I think N4KG's advice and
resetting the guys will suffice for a guyed tower. On a crank up like I
have there is an adjustment on the base pins (made from 1" universal bolt).
There is 3" of bolt above the concrete base and I have a big wrench made by
Lou Tristao that I use to adjust the level. A crank up should be as close
to level as possible! I adjust mine each spring and then adjust the guys
(If you have a guyed crank up).
Dave K4JRB
List Sponsor: Are you thinking about installing a tower this summer? Call us
for information on our fabulous Trylon Titan self-supporting towers - up to
96-feet for less than $2000! at 888-833-3104 <A
HREF="http://www.ChampionRadio.com">
www.ChampionRadio.com</A>
-----
FAQ on WWW: http://www.contesting.com/FAQ/towertalk
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
|